PHE WEST MADURA OFFSHORE

SOW

Provision of slickline and goods, material, services, personnel requirement and perform work in support of PHE WMO’s offshore activities on a 24-hour day, 7-day week basis. In full and open cooperation with requests and instruction received from PHE WMO.

Slickline Detail Work Description

  • Tubing Clearance
  • Running & Pulling Plug & Prong
  • Setting and Pulling Back Pressure Valve
  • Opening and Closing Sliding Sleeve Door
  • Mechanical Tubing Puncher
  • Fishing Job, Sand Bailing
  • Tubing Leak Isolation (Pack Off)
  • Pulling and setting Retrieveable Gas Lift
  • Running & Pulling TRSSSV
  • Setting and Pulling X-Lock Mandrel
  • Running and Pulling Survey using Electronic Memory Bottom Hole
  • Pressure and Temperature (EMR / MPLT)

 

Slickline Surface Equipment :

  • Slickline Unit Double Drum (NDT Certified annually, Visual Check per 6 Month)
    • 0.108” SS316 Wire On Upper Drum
    • 0.125” Carbon Steel Wire On Lower Drum
  • Powerpack 6 Cyclinder (120 Hp, Zone 2) (NDT Certified annually, Visual Check per 6 Month)
  • Slickline Container 10 ft (NDT Certified annually, Visual Check per 6 Month)
  • Lubricator Rack (NDT Certified annually, Visual Check per 6 Month)
  • 3” BOP Rack (NDT Certified annually, Visual Check per 6 Month)
  • 4” BOP Rack (NDT Certified annually, Visual Check per 6 Month)
  • Pressure Control Equipment (Hydrotest Certified Annually) :
    • 4” ID x 8 ft Integral Lubricator, 8.375”-4 ACME ‘O’ Pin Collar Box, 10K WP, H2S SVC
    • 3” ID x 8 ft Integral Lubricator, 5.75”-4 ACME ‘O’ Pin Collar Box, 10K WP, H2S SVC
    • 16” Sheave Hydraulic Stuffing Box, 5.75”-4 ACME ‘O’ Pin Collar, 10K WP, H2S SVC
    • 3” ID Hydraulic Double RAM BOP (Seal & Shear Ram), 5.75”-4 ACME ‘O’ Pin Collar Box, 10K WP, H2S SVC
      –4” ID Hydraulic Double RAM BOP (Seal, Shear Ram), 8.375”-4 ACME ‘O’ Pin Collar Box, 10K WP, H2S SVC

 

Additional SoW (Ammandemen) :

  • Provision Of Completion Engineer :
    • Running Chrome and Carbon Steel Tubing Completion Programs
    • Single Completion Type, Included single monobore well
    • Dual Completion Type, Included Dual Monobore well
    • Performing functional test all completion accessories (other manufacturer’s completion accessories but not limited to Otis, Camco, Baker) variance of gas lift mandrels, sub surface safety valve, sliding sleeve door, production packer, landing nipples, pump out sub.
    • Redressing and installing most of completion equipment
    • Installation and functional testing of sub surface safety valves (SCSSV) and the running and installation of the control line to safety valve and tubing hanger.
    • Supervising the running and setting of completion accessories
    • Performing tubing tally for accurate placement of completion equipment
    • Providing Toolbox which contain tool for support performing completion program
  • Redress 9-5/8” x 3-1/2” ESP Packer and Vent Valve